October 13 was a BIG day at Casa Hogar Sagrada Familia. The long-awaited construction finally begins a year after breaking ground. The teens moved their living quarters to San Lucas Church and today was moving day. With all the dust generated and the hazards of construction equipment it was decided that it was too hazardous to keep the kids on site.
The first step was to tear down the old storage shed
and move the sillar blocks to make a storage area for building supplies.
Kids then packed up their mattresses and beds
and loaded them onto the van for the move.
Here, Susana is in the middle of mattresses and bags of clothes.
The kitchen has to go too.
So Susana carries a hefty bag of foodstuffs.
So Susana carries a hefty bag of foodstuffs.
No comments:
Post a Comment