When a Global Alpha Training team from Christ Church, Denver visited Arequipa, they toured the construction site at Casa Hogar Sagrada Familia. The concrete roof was poured just before Christmas and at this point, they were preparing to stucco the walls inside.
Much sand and gravel is needed for the floors yet to be poured.
The casa will feature beautiful arches.
Seen here are Alba, Gloria, Rhonda, Bunnie, and Jamie.
The covered walkway between the arches and the rooms.
Bunnie and Penny lead the way.
Here you can more easily see the future bedrooms
from the covered walkway.
The inside of a large bedroom.
This area will become the dining hall and the computer area.
View from above of the construction site.
No comments:
Post a Comment